Take a look at our photo gallery for photos of the project.The total cost of the Renovation/Addition Building Project was approximately $2,900,000.What was included: 8400 square foot addition including: q
Gymnasium
3400 sq. ft. for joint school and community use q
Life
skills/special needs facility 1200 sq. ft. q
Multi-purpose
room 1000 sq. ft. q
Kitchen
200 sq. ft. with canteen style window and shutter q
Ancillary
space 2800 sq. ft. to include new custodial room and new accessible washroom Renovations and upgrading of the existing facility included: q
Structural,
mechanical and electrical upgrading such as west wall replacement, foundation
and floor structure repair, roof replacement, sprinkler fire protection system,
and ventilation system upgrade q
Renovated
existing gym to library q
Renovated
existing library to computer lab q
Renovated
existing classroom to science/art room q
Renovated
existing classroom to resource teaching area with smaller meeting rooms q
Replaced
existing windows and outside doors to retain the heritage look q
New
public entrance off the Clifton St. back lane with bus loop for the special
needs students What didn't change: q
The warmth of our hardwood floors q
The wide hallways that are used as extensions of the
classroom q
The natural lighting through our large windows q
The French door at the entrance of each classroom q
The Heritage look to the brick exterior q
The school situated at the top of the hill overlooking the
playing field and the new play structure q
The hill as a community meeting place and winter sled run q
The new community play structure |