At the meeting held on March 21, 2000, the Board of Trustees approved the 5
Year Technology Integration Plan (2000/2001 to 2004/2005).
A key component of
the 5 year Technology Integration Plan included a four year local area
network cabling upgrade program in all local area networks in schools and
administrative buildings. The 2003/2004 school year was the
fourth and final year of the 4 year local area network upgrading initiative.
The goal of the school-wide local area network infrastructure improvement
project was to build a solid local area network infrastructure designed to
support each school's immediate and long term technology requirements. The
resulting local area network configuration will allow for an appropriate
number of network connections and sufficient throughput to support the
school's immediate and long term instructional and administration utilization
of technology.